Use case 28.08.2026 · 5 min read

National Energy Operator Migrates SCADA & Telemetry Systems to Isolated Private Cloud

Transitioning high-voltage electrical grid monitoring to geographically distributed Tier III datacenters with strict cryptographic air-gaps.

Operating critical infrastructure mandates zero tolerance for packet loss and stringent compliance with national defense protocols. A regional power distribution company selected Lailio to modernize legacy telemetry systems serving over 400 substations.

Architectural Execution

  • Hardware Air-Gap Isolation: Unidirectional optical data diodes enforce unidirectional telemetry ingress without network exposure.
  • Sub-Second Geographic Failover: Active-active core infrastructure between twin Riga Tier III facilities ensures uninterrupted visibility.
  • Guaranteed SRE Response: Dedicated 24/7/365 engineering escalation response within 15 minutes.

Details

Category Use case
Date 28.08.2026
Industry Energy & Critical Utilities